Pump cavitation caught three weeks early
Predictive maintenanceMunicipal & Public Utilities
The vibration signature changed about three weeks before anyone would have heard it.
A municipal water facility’s pump developed a changing vibration signature before the problem became audible. We follow that trend at the bearing housing to give maintenance time to plan a repair.
What the data showed
Explore the chart to inspect the readings.
| Interval | Pump 4 · RMS (mm/s) |
|---|---|
| D1 | 2.81 |
| D2 | 2.73 |
| D3 | 2.71 |
| D4 | 2.75 |
| D5 | 2.67 |
| D6 | 2.81 |
| D7 | 2.73 |
| D8 | 2.63 |
| D9 | 2.79 |
| D10 | 2.59 |
| D11 | 2.61 |
| D12 | 2.78 |
| D13 | 2.63 |
| D14 | 2.70 |
| D15 | 2.70 |
| D16 | 2.80 |
| D17 | 2.68 |
| D18 | 2.61 |
| D19 | 2.81 |
| D20 | 2.59 |
| D21 | 3.22 |
| D22 | 3.50 |
| D23 | 3.88 |
| D24 | 4.40 |
| D25 | 4.71 |
| D26 | 5.19 |
| D27 | 5.60 |
| D28 | 6.10 |
| D29 | 6.43 |
| D30 | 6.88 |
| Before | A repair scheduled by failure |
|---|---|
| After | A repair scheduled by calendar |
Background
A municipal water facility relies on a pump whose internal condition is difficult to judge while it runs. Cavitation can damage the impeller progressively. Our monitoring looks for a change in the pump’s vibration signature while there is still time for maintenance to investigate and arrange the work.
The problem
The pump’s vibration changes before the fault becomes audible. By the time someone can hear the problem on the floor, damage has occurred and the repair can force an unplanned outage. The team needs an earlier indication tied to the pump itself, with a record showing how its behaviour is changing.
How we found it
We use a vibration sensor at the pump bearing housing and a temperature probe on the housing. Trend-based alerts draw attention to changes in the readings. Following the vibration signature over time makes the developing problem visible ahead of the point at which it would become audible to the team.
What changed
Maintenance has warning in advance of audible failure and can schedule the repair. The operating history gives the team a reason to inspect the pump and a basis for arranging the work.
The lesson
Track changes in vibration and temperature over time to give maintenance warning before the fault becomes audible. Keep the history to review the developing condition, record the repair and check operation afterwards.
What changed
Before
A repair scheduled by failure
After
A repair scheduled by calendar
3 weeksof warning
Between the first signature change and the point of audible failure.
Where to go next
Predictive maintenanceBulk Handling & Rail LogisticsManufacturing: automotive, plastics & rubber
Conveyor-drive bearing degradation detected six weeks before failure
A bulk handling facility
The bearing’s vibration signature began changing approximately six weeks before the projected failure point.
6 weeksof warning
Predictive maintenanceWaterBreweries & Beverage
A failing diaphragm pump, caught before it failed
Carlsberg Canada
A transfer line's flow signature drifted, the alert fired, and the diaphragm was replaced on a schedule instead of during a shutdown.
Scheduledreplacement
See where monitoring could help your facility.
Our team will walk your facility with you and identify where monitoring could help.
Book a site visitAll case studies