WEBVTT

00:00:04.600 --> 00:00:08.468
When maintenance follows a calendar,
parts get changed on schedule.

00:00:08.983 --> 00:00:10.483
Some may still have life left.

00:00:11.277 --> 00:00:13.059
Others may fail before their date.

00:00:17.359 --> 00:00:20.344
Predictive maintenance follows
the condition of the equipment.

00:00:21.049 --> 00:00:24.314
Readings of vibration,
temperature, motor current,

00:00:24.364 --> 00:00:27.512
and flow help show how a
machine is doing over time.

00:00:31.412 --> 00:00:36.092
A deteriorating bearing can change its
vibration signature weeks before it fails.

00:00:36.812 --> 00:00:39.822
Rising temperature, a
shift in current draw,

00:00:39.872 --> 00:00:43.242
or a flow pattern that drifts
can also be an early warning.

00:00:45.442 --> 00:00:47.841
Those changes give your team
something to investigate.

00:00:48.596 --> 00:00:50.691
Catching a problem early
can help you plan a

00:00:50.741 --> 00:00:53.592
repair around production
during a planned stop.

00:00:57.992 --> 00:01:01.492
The machine's own signals help you
decide when it needs attention.

00:01:03.684 --> 00:01:05.474
Listen for the early signs.

00:01:05.939 --> 00:01:07.439
Plan the next repair.

